March 2008 The idea of Cambium crystallised in the mind of founder Francois Harley.
June 2008 The first Cambium advertising hit the naturist press.
November 2008 Enough expressions of interest had been received to justify detailed land hunting.
December 2008 Land hunting started in earnest.
April 2009 First public Cambium meeting in London. 11 Quarter acre plots were reserved.
Summer 2009 American road show generated 17 more reservations
May 2010 Enough investment accumulated to buy the land
June 2010 Took possession of the Cambium land
August 2010 Road building began.
Solar power installed at Base Camp.
September 2010 Half the roads were cut and two pipe bridges built.
Six Cambium employees living at Base Camp.
October 2010 Two more pipe bridges built, construction of the gate house started, first bore hole drilled.
January 2011 Water supply deal signed with neighboring farmer.
Trenching under way for the water mains.
Gate house finished and entrance walls started.
February 2011 First resident's house built on Bamboo 16. Found water in the third bore hole.
March 2011 Second and third houses under construction.
24 hour guard service established.
April 2011 Second resident's house was completed.
May 2011 Satellite Internet connection with WiFi was established.
Construction of Nudels, the restaurant was started.
June 2011 Chicken pen built and populated with 11 birds.
Kitchen garden producing many decorative and fruiting trees and other plants.
July 2011 The roads on the western side of the river were completed.
Cambium paid for the improvement of the public road to its gate.
August 2011 Building of houses 4 and 5 was started.
Huricane Irene passed with little damage.
September 2011 Nudels restaurant opened with a great party.
December 2011 The founder's house was completed in 4 months from the start.
A grazing contract was completed with our neighbor to benefit from our grass.
February 2012 A further three houses were commissioned for building.
March 2012 The first two Palm Gardens houses were sold.